EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
Serg
-
Listing for Category : controls
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (110)
Research
Workshop
- (3)
-
Trim tabs
-
Kit Arrived
-
Kit Arrived
Empennage
- (4)
-
Elevator Trim
-
Elevator
-
Elevators
-
Horizontal stabilizers
Fuselage
- (62)
-
Windshield
-
Windshield
-
Skylight
-
Skylight
-
Skylight
-
Window frames
-
Window frames
-
Side windows
-
Side windows
-
Side windows
-
Various
-
Windshield
-
Windshield
-
Windshield
-
Windshield
-
Windshield
-
Windshield
-
Windshield
-
Windshield
-
Hung wings!
-
Windscreen
-
Windscreen
-
More deburring!!
-
Deburring all sheet...
-
Boot cowl
-
Fuel lines
-
Boot cowl
-
Front door
-
Front door
-
Rear window C frame
-
Window C frame
-
Cargo wall and C...
-
Window frames
-
Door skins
-
Main door
-
Baggage door
-
Various sheet metal...
-
Boot cowl
-
Boot cowl
-
Boot cowl
-
Boot cowl
-
Elevator trim
-
Various
-
Boot cowl
-
Door frames
-
Rear windows
-
Rear windows
-
Rear windows
-
Fuselage stringers
-
Stringers
-
Boot cowl
-
Boot cowl
-
Boot cowl
-
Boot cowl
-
Boot cowl
-
Boot cowl
-
Boot cowl
-
Boot cowl
-
Boot cowl
-
Boot cowl
-
Finished floors
-
Floors
Firewall
- (5)
-
Firewall fitting
-
Hot air outlet...
-
Fitting parts
-
Firewall fitting
-
Fitted firewall
Tail Feathers
Wings
- (10)
-
Flap controls
-
Aileron/flap hinges
-
Aileron cables
-
Flap/aileron controls
-
Aileron controls
-
Aileron controls
-
Aileron controls
-
Wing hardware
-
Cables
-
Opened wings
Controls
- (10)
-
Rudder cables
-
Throttle quadrants
-
Rudder control
-
Flap cable
-
Pulleys
-
Pulley guards
-
Stick carrier
-
Stick carrier
-
Flap handle
-
Brake pedals
Avionics
Lighting
Instrument Panel
Landing Gear
- (8)
-
Brake lines
-
Brake lines
-
Gear leg fairings
-
Gear leg fairings
-
Gear leg fairings
-
Installed brake...
-
Brake torque plates
-
Landing gear
Engine
Propeller
Fuel System
- (4)
-
Fuel lines
-
Fuel lines
-
Fuel selector
-
Fuel lines
Interior Finish
- (4)
-
Floors
-
Cabin floor
-
Floor nut plates
-
Floors
Paint / Decals
Inspection
Tools
Builder Name:
Sergio Desiati
-
Project:
Bearhawk - Patrol
-
VIEW REPORTS
Total Hours:
285.2
Start/Last Date:
Aug 31, 2019 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=Serg
Home or Last Project Picture
Jan 26, 2020
Rudder cables
- (2.3 hours)
Category: Controls
Installed rudder cables and turnbuckles. All good!
4A2BF9A9-28AE-44F8-A627-E29FAF08F772.jpeg
E48C3EB2-BD87-4430-9CD3-2219EAB3B3DF.jpeg
F0BDBAE9-F688-495D-A61A-4BFEFB5E04E7.jpeg
Dec 08, 2019
Throttle quadrants
- (.5 hour)
Category: Controls
Fitted forward and aft throttle quadrants.
0E6A9434-8667-4FFB-8A55-1BFC4A76DA91.jpeg
23880F95-096E-42E7-89BD-B227E7FC6956.jpeg
Oct 24, 2019
Rudder control
- (3.5 hours)
Category: Controls
Installed toe brakes, both master cylinders. Fabricated and swaged router control cables to aft of cargo compartment. All swages within spec.
43D7CDF9-4EDC-4FA6-9E7C-3F5C6105C166.jpeg
9E5DBB8E-DFC5-4100-A3A0-663725E35FD8.jpeg
D61695F1-2DFB-4F4A-A716-730531574843.jpeg
Oct 23, 2019
Flap cable
- (2.1 hours)
Category: Controls
Apparently I really needed practice with swaging. It took four tries to get the two ends of the cable swaged. Very happy with the outcome now.
1C39CD2A-80B3-472A-8DE2-E5DECD1A0F03.jpeg
B16973C2-6890-4882-A7E9-CF23A23CB200.jpeg
Oct 23, 2019
Pulleys
- (1 hour)
Category: Controls
Installed aileron and flap control pulleys.
03B3C6E3-F5F0-40CB-A027-ABEC0A81361E.jpeg
2D6F1486-A95F-4C2F-969A-99168A6F84B0.jpeg
7E553CCA-A9E2-4C89-8816-60E099943B04.jpeg
Oct 22, 2019
Pulley guards
- (1.1 hours)
Category: Controls
Fabricated pulley guards from .032... Took a while to get the measurements right, but eventually found an ideal forming block to make these.
image.jpg
Oct 21, 2019
Stick carrier
- (2.3 hours)
Category: Controls
Finished installing stick carrier, and connected to primary elevator pushrod. Nut and bolt clearance inside stick carrier was very tight and required cutting and drilling bolts to custom length. I am very happy with the outcome.
121B2132-073B-4763-856A-937686DD0D47.jpeg
2DE3A71E-B32C-4E34-A8DD-1B4D93FCD3BD.jpeg
B530BA29-F3F3-46C6-AFAC-460665859EE2.jpeg
C7687028-09CF-49AC-AA85-355CD14FE2E1.jpeg
Sep 29, 2019
Stick carrier
- (2.5 hours)
Category: Controls
Fitted and installed control stick carrier and elevator idler arm. Installed more fairleads. Missing 3 from hardware kit.
IMG_0605.jpeg
IMG_0606.jpeg
IMG_0607.jpeg
Sep 28, 2019
Flap handle
- (2.3 hours)
Category: Controls
Fitted and installed flap handle assembly.
IMG_0586.jpeg
Sep 08, 2019
Brake pedals
- (0.5 hour)
Category: Controls
Fitted and installed front and rear brake pedals.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.